BAHRAIN 400 Kv Loop

In a significant project undertaken in Bahrain, we played a pivotal role in the cable lay operation involving six power cables and three fiber optic cables. This project was distinguished by our remarkable cable burial operation, where we set new benchmarks in terms of depth and precision. Our team executed a meticulously planned pre-lay trenching operation, achieving depths of 5 meters and 3 meters, a notable achievement in the field. Following this, we installed the cables within the trench. The culmination of this project was the Jeting operation, designed to ensure that the cables reached the desired burial depth. To accomplish this, we innovatively modified our STC machine, equipping it with a powerful trenching chain capable of creating trenches 5 meters deep and 0.8 meters wide. This modification not only exemplified our ability to adapt our equipment to meet specific project requirements but also showcased our commitment to delivering solutions that meet the highest standards of efficiency and effectiveness.

Year: 2020

Client: Prysmian Power Link

Main Client: EWA